BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 1998/11/191 分钟阅读

Hot Rolled Lead and Bismuth Carbon Steel Products From Germany: Extension of Time Limits for Preliminary Results of Antidumping Administrative Review

本地自动翻译 · 来源原始语言

摘要

The Department of Commerce (the Department) is extending the time limit for the preliminary results of the administrative review of the antidumping duty order on hot rolled lead and bismuth carbon steel products from Germany. The review covers one manufacturer/exporter and the period March 1, 1997, through February 28, 1998.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →