Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 19/11/19981 min de lecture
Hot Rolled Lead and Bismuth Carbon Steel Products From Germany: Extension of Time Limits for Preliminary Results of Antidumping Administrative Review
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce (the Department) is extending the time limit for the preliminary results of the administrative review of the antidumping duty order on hot rolled lead and bismuth carbon steel products from Germany. The review covers one manufacturer/exporter and the period March 1, 1997, through February 28, 1998.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →