Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.
Regulación y derecho · 19/11/19981 min de lectura
Hot Rolled Lead and Bismuth Carbon Steel Products From Germany: Extension of Time Limits for Preliminary Results of Antidumping Administrative Review
Traducción automática local · Idioma original de la fuente
Resumen
The Department of Commerce (the Department) is extending the time limit for the preliminary results of the administrative review of the antidumping duty order on hot rolled lead and bismuth carbon steel products from Germany. The review covers one manufacturer/exporter and the period March 1, 1997, through February 28, 1998.
Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →