BN Business News
Bedrijf toevoegen →
Deze vertaling wordt voorbereid. Voorlopig tonen we de oorspronkelijke Engelse versie.

Regelgeving en recht · 19-11-19981 min lezen

Hot Rolled Lead and Bismuth Carbon Steel Products From Germany: Extension of Time Limits for Preliminary Results of Antidumping Administrative Review

Lokale automatische vertaling · Oorspronkelijke brontaal

Samenvatting

The Department of Commerce (the Department) is extending the time limit for the preliminary results of the administrative review of the antidumping duty order on hot rolled lead and bismuth carbon steel products from Germany. The review covers one manufacturer/exporter and the period March 1, 1997, through February 28, 1998.

Oorspronkelijke brontaal: Federal Register — All DocumentsOrigineel bericht openen →