BN Business News
Добавить компанию →
Этот перевод готовится. Пока мы временно показываем оригинальную версию на английском языке.

Регулирование и право · 09.11.20051 мин чтения

Basin Electric Power Cooperative, Inc.; Notice of Intent To Hold Public Scoping Meetings and Prepare an Environmental Impact Statement

Локальный автоматический перевод · Язык оригинального источника

Краткое содержание

The Rural Utilities Service (RUS) intends to hold public scoping meetings and prepare an environmental impact statement (EIS) in connection with possible impacts related to a project being proposed by Basin Electric Power Cooperative, Inc. (Basin Electric), of Bismarck, North Dakota. The proposal consists of the construction and operation of a coal-fired electric generation facility referred to as the Dry Fork Station, consisting of a single maximum net 385 Megawatt (MW) unit, at a site in Gillette, Wyoming, and the construction of 130 miles of 230 kilovolt (kV) transmission line in Campbell and Sheridan counties, referred to as the Hughes Transmission Project.

Язык оригинального источника: Federal Register — All DocumentsОткрыть исходное сообщение →

Другие тематические подборки

Деловая аналитика →