BN Business News
Unternehmen hinzufügen →
Diese Übersetzung wird noch vorbereitet. Bis dahin zeigen wir vorübergehend die englische Originalversion.

Regulierung & Recht · 9.11.20051 Min. Lesezeit

Basin Electric Power Cooperative, Inc.; Notice of Intent To Hold Public Scoping Meetings and Prepare an Environmental Impact Statement

Lokale automatische Übersetzung · Originalsprache der Quelle

Zusammenfassung

The Rural Utilities Service (RUS) intends to hold public scoping meetings and prepare an environmental impact statement (EIS) in connection with possible impacts related to a project being proposed by Basin Electric Power Cooperative, Inc. (Basin Electric), of Bismarck, North Dakota. The proposal consists of the construction and operation of a coal-fired electric generation facility referred to as the Dry Fork Station, consisting of a single maximum net 385 Megawatt (MW) unit, at a site in Gillette, Wyoming, and the construction of 130 miles of 230 kilovolt (kV) transmission line in Campbell and Sheridan counties, referred to as the Hughes Transmission Project.

Originalsprache der Quelle: Federal Register — All DocumentsOriginalquelle öffnen →

Weitere Themen

Business-Analysen →