BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Regulação e direito · 09/11/20051 min de leitura

Basin Electric Power Cooperative, Inc.; Notice of Intent To Hold Public Scoping Meetings and Prepare an Environmental Impact Statement

Tradução automática local · Idioma original da fonte

Resumo

The Rural Utilities Service (RUS) intends to hold public scoping meetings and prepare an environmental impact statement (EIS) in connection with possible impacts related to a project being proposed by Basin Electric Power Cooperative, Inc. (Basin Electric), of Bismarck, North Dakota. The proposal consists of the construction and operation of a coal-fired electric generation facility referred to as the Dry Fork Station, consisting of a single maximum net 385 Megawatt (MW) unit, at a site in Gillette, Wyoming, and the construction of 130 miles of 230 kilovolt (kV) transmission line in Campbell and Sheridan counties, referred to as the Hughes Transmission Project.

Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →

Explorar análises

Análises empresariais →