BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

에너지 및 환경 · 2025. 7. 11.1 분 읽기

Colorado River Storage Project-Rate Order No. WAPA-220

로컬 자동 번역 · 원본 출처 언어

요약

The formula rates for the Colorado River Storage Project (CRSP) region's transmission and ancillary services for CRSP's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should CRSP decide to become a member of SPP, have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rate). If CRSP decides to become a member of SPP, these new formula rates under Rate Schedules CRCMT-ATRR (transmission), CRCMT-AS1 (scheduling, system control, and dispatch), and CRCMT-PTP (firm point-to-point) will supersede the existing formula rates for transmission and ancillary services under Rate Schedules SP- NW6, SP-PTP10, SP-NFT9, SP-NFJDT, SP-UU3, SP-EI6, and SP-SSR6, which expire on December 31, 2028.

원본 출처 언어: Federal Register — Energy Department원문 발표 열기 →