BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Énergie et environnement · 11/07/20251 min de lecture

Colorado River Storage Project-Rate Order No. WAPA-220

Traduction automatique locale · Langue originale de la source

Résumé

The formula rates for the Colorado River Storage Project (CRSP) region's transmission and ancillary services for CRSP's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should CRSP decide to become a member of SPP, have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rate). If CRSP decides to become a member of SPP, these new formula rates under Rate Schedules CRCMT-ATRR (transmission), CRCMT-AS1 (scheduling, system control, and dispatch), and CRCMT-PTP (firm point-to-point) will supersede the existing formula rates for transmission and ancillary services under Rate Schedules SP- NW6, SP-PTP10, SP-NFT9, SP-NFJDT, SP-UU3, SP-EI6, and SP-SSR6, which expire on December 31, 2028.

Langue originale de la source: Federal Register — Energy DepartmentOuvrir le communiqué original →

Explorer les analyses

Analyses business →