BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Energía y medio ambiente · 11/7/20251 min de lectura

Colorado River Storage Project-Rate Order No. WAPA-220

Traducción automática local · Idioma original de la fuente

Resumen

The formula rates for the Colorado River Storage Project (CRSP) region's transmission and ancillary services for CRSP's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should CRSP decide to become a member of SPP, have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rate). If CRSP decides to become a member of SPP, these new formula rates under Rate Schedules CRCMT-ATRR (transmission), CRCMT-AS1 (scheduling, system control, and dispatch), and CRCMT-PTP (firm point-to-point) will supersede the existing formula rates for transmission and ancillary services under Rate Schedules SP- NW6, SP-PTP10, SP-NFT9, SP-NFJDT, SP-UU3, SP-EI6, and SP-SSR6, which expire on December 31, 2028.

Idioma original de la fuente: Federal Register — Energy DepartmentAbrir el comunicado original →