BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

금융 및 시장 · 2021. 10. 21.1 분 읽기

Record of Decision for the Proposed Construction and Operation of a Currency Production Facility Within the National Capital Region

로컬 자동 번역 · 원본 출처 언어

요약

The U.S. Department of the Treasury (Treasury), Bureau of Engraving and Printing (BEP) announces the availability of the Record of Decision (ROD) for the proposed construction and operation of a Currency Production Facility (CPF) within the National Capital Region (NCR) (Proposed Action). Treasury previously published its Final Environmental Impact Statement (EIS) for the Proposed Action on June 4, 2021. In accordance with the National Environmental Policy Act (NEPA), the ROD identifies all alternatives Treasury considered for the Proposed Action, identifies the environmentally preferable alternative, states Treasury's decision to implement the Preferred Alternative, and discusses factors balanced by the agency in making its decision. The ROD also adopts all practicable mitigation measures to avoid or minimize environmental harm and commits to monitoring their implementation. The Proposed Action will replace Treasury's insufficient Washington, DC production facility (DC Facility), and will provide Treasury with a modern, scalable, sufficiently sized production facility within the NCR that meets Treasury's needs. Treasury has also signed a Finding of No Practicable Alternative (FONP

원본 출처 언어: Federal Register — Department of the Treasury원문 발표 열기 →