BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

金融与市场 · 2021/10/211 分钟阅读

Record of Decision for the Proposed Construction and Operation of a Currency Production Facility Within the National Capital Region

本地自动翻译 · 来源原始语言

摘要

The U.S. Department of the Treasury (Treasury), Bureau of Engraving and Printing (BEP) announces the availability of the Record of Decision (ROD) for the proposed construction and operation of a Currency Production Facility (CPF) within the National Capital Region (NCR) (Proposed Action). Treasury previously published its Final Environmental Impact Statement (EIS) for the Proposed Action on June 4, 2021. In accordance with the National Environmental Policy Act (NEPA), the ROD identifies all alternatives Treasury considered for the Proposed Action, identifies the environmentally preferable alternative, states Treasury's decision to implement the Preferred Alternative, and discusses factors balanced by the agency in making its decision. The ROD also adopts all practicable mitigation measures to avoid or minimize environmental harm and commits to monitoring their implementation. The Proposed Action will replace Treasury's insufficient Washington, DC production facility (DC Facility), and will provide Treasury with a modern, scalable, sufficiently sized production facility within the NCR that meets Treasury's needs. Treasury has also signed a Finding of No Practicable Alternative (FONP

来源原始语言: Federal Register — Department of the Treasury打开原始公告 →

探索专题

商业洞察 →