BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Finanzas y mercados · 21/10/20211 min de lectura

Record of Decision for the Proposed Construction and Operation of a Currency Production Facility Within the National Capital Region

Traducción automática local · Idioma original de la fuente

Resumen

The U.S. Department of the Treasury (Treasury), Bureau of Engraving and Printing (BEP) announces the availability of the Record of Decision (ROD) for the proposed construction and operation of a Currency Production Facility (CPF) within the National Capital Region (NCR) (Proposed Action). Treasury previously published its Final Environmental Impact Statement (EIS) for the Proposed Action on June 4, 2021. In accordance with the National Environmental Policy Act (NEPA), the ROD identifies all alternatives Treasury considered for the Proposed Action, identifies the environmentally preferable alternative, states Treasury's decision to implement the Preferred Alternative, and discusses factors balanced by the agency in making its decision. The ROD also adopts all practicable mitigation measures to avoid or minimize environmental harm and commits to monitoring their implementation. The Proposed Action will replace Treasury's insufficient Washington, DC production facility (DC Facility), and will provide Treasury with a modern, scalable, sufficiently sized production facility within the NCR that meets Treasury's needs. Treasury has also signed a Finding of No Practicable Alternative (FONP

Idioma original de la fuente: Federal Register — Department of the TreasuryAbrir el comunicado original →