BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

에너지 및 환경 · 2011. 10. 13.1 분 읽기

Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

로컬 자동 번역 · 원본 출처 언어

요약

The U.S. Nuclear Regulatory Commission (NRC or the Commission) is requesting public comment on chapters 1-6 of Draft Interim Staff Guidance (ISG), NPR-ISG-2011-002, that augments NUREG-1537, part 1, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content," for the Production of Radioisotopes and NUREG-1537, part 2, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review Plan and Acceptance Criteria," for the Production of Radioisotopes (chapters 7-18 of the ISG will be published in a future Federal Register notice). This ISG provides guidance to potential applicants for preparing an application to obtain a construction and operating license for a radioisotope production facility and the Research and Test Reactor Licensing Branch (PRLB) of the Division of Policy and Rulemaking (DPR) and the Office of Nuclear Reactor Regulation (NRR) on the information that should be included in such application.

원본 출처 언어: Federal Register — Nuclear Regulatory Commission원문 발표 열기 →