BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Energia e ambiente · 13/10/20111 min di lettura

Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

The U.S. Nuclear Regulatory Commission (NRC or the Commission) is requesting public comment on chapters 1-6 of Draft Interim Staff Guidance (ISG), NPR-ISG-2011-002, that augments NUREG-1537, part 1, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content," for the Production of Radioisotopes and NUREG-1537, part 2, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review Plan and Acceptance Criteria," for the Production of Radioisotopes (chapters 7-18 of the ISG will be published in a future Federal Register notice). This ISG provides guidance to potential applicants for preparing an application to obtain a construction and operating license for a radioisotope production facility and the Research and Test Reactor Licensing Branch (PRLB) of the Division of Policy and Rulemaking (DPR) and the Office of Nuclear Reactor Regulation (NRR) on the information that should be included in such application.

Lingua originale della fonte: Federal Register — Nuclear Regulatory CommissionApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →