BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Energía y medio ambiente · 13/10/20111 min de lectura

Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

Traducción automática local · Idioma original de la fuente

Resumen

The U.S. Nuclear Regulatory Commission (NRC or the Commission) is requesting public comment on chapters 1-6 of Draft Interim Staff Guidance (ISG), NPR-ISG-2011-002, that augments NUREG-1537, part 1, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content," for the Production of Radioisotopes and NUREG-1537, part 2, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review Plan and Acceptance Criteria," for the Production of Radioisotopes (chapters 7-18 of the ISG will be published in a future Federal Register notice). This ISG provides guidance to potential applicants for preparing an application to obtain a construction and operating license for a radioisotope production facility and the Research and Test Reactor Licensing Branch (PRLB) of the Division of Policy and Rulemaking (DPR) and the Office of Nuclear Reactor Regulation (NRR) on the information that should be included in such application.

Idioma original de la fuente: Federal Register — Nuclear Regulatory CommissionAbrir el comunicado original →