이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.
규제 및 법률 · 2008. 10. 29.1 분 읽기
Certain Hot-Rolled Carbon Steel Flat Products from Thailand: Extension of Time Limit for Final Results of Changed Circumstances Review
로컬 자동 번역 · 원본 출처 언어
요약
The U.S. Department of Commerce ("the Department") is extending the time limit for the final results of the changed circumstances review of the antidumping duty order on certain hot- rolled carbon steel flat products ("hot-rolled steel") from Thailand. The period of review is October 1, 2005, through September 30, 2006. This extension is made pursuant to 19 CFR 351.216(e).
원본 출처 언어: Federal Register — All Documents원문 발표 열기 →