BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 29/10/20081 min de lectura

Certain Hot-Rolled Carbon Steel Flat Products from Thailand: Extension of Time Limit for Final Results of Changed Circumstances Review

Traducción automática local · Idioma original de la fuente

Resumen

The U.S. Department of Commerce ("the Department") is extending the time limit for the final results of the changed circumstances review of the antidumping duty order on certain hot- rolled carbon steel flat products ("hot-rolled steel") from Thailand. The period of review is October 1, 2005, through September 30, 2006. This extension is made pursuant to 19 CFR 351.216(e).

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →