本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2008/10/291 分钟阅读
Certain Hot-Rolled Carbon Steel Flat Products from Thailand: Extension of Time Limit for Final Results of Changed Circumstances Review
本地自动翻译 · 来源原始语言
摘要
The U.S. Department of Commerce ("the Department") is extending the time limit for the final results of the changed circumstances review of the antidumping duty order on certain hot- rolled carbon steel flat products ("hot-rolled steel") from Thailand. The period of review is October 1, 2005, through September 30, 2006. This extension is made pursuant to 19 CFR 351.216(e).
来源原始语言: Federal Register — All Documents打开原始公告 →