이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.
규제 및 법률 · 1998. 11. 19.1 분 읽기
Hot-Rolled Lead and Bismuth Carbon Steel Products From Germany: Extension of Time Limit for Preliminary Results of Countervailing Duty Administrative Review
로컬 자동 번역 · 원본 출처 언어
요약
The Department of Commerce (the Department) is extending the time limit for the preliminary results of the administrative review of the countervailing duty order on hot rolled lead and bismuth carbon steel products from Germany. The review covers one manufacturer/ exporter and the period January 1, 1997, through December 31, 1997.
원본 출처 언어: Federal Register — All Documents원문 발표 열기 →