Deze vertaling wordt voorbereid. Voorlopig tonen we de oorspronkelijke Engelse versie.
Regelgeving en recht · 19-11-19981 min lezen
Hot-Rolled Lead and Bismuth Carbon Steel Products From Germany: Extension of Time Limit for Preliminary Results of Countervailing Duty Administrative Review
Lokale automatische vertaling · Oorspronkelijke brontaal
Samenvatting
The Department of Commerce (the Department) is extending the time limit for the preliminary results of the administrative review of the countervailing duty order on hot rolled lead and bismuth carbon steel products from Germany. The review covers one manufacturer/ exporter and the period January 1, 1997, through December 31, 1997.
Oorspronkelijke brontaal: Federal Register — All DocumentsOrigineel bericht openen →