この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。
規制と法律 · 1998/11/191 分で読めます
Hot-Rolled Lead and Bismuth Carbon Steel Products From Germany: Extension of Time Limit for Preliminary Results of Countervailing Duty Administrative Review
ローカル自動翻訳 · 情報源の原言語
概要
The Department of Commerce (the Department) is extending the time limit for the preliminary results of the administrative review of the countervailing duty order on hot rolled lead and bismuth carbon steel products from Germany. The review covers one manufacturer/ exporter and the period January 1, 1997, through December 31, 1997.
情報源の原言語: Federal Register — All Documents原文の発表を開く →