이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.
규제 및 법률 · 1996. 11. 6.1 분 읽기
Certain Welded Carbon Steel Pipe and Tube Products from Turkey; Extension of Time Limit for Countervailing Duty Administrative Review
로컬 자동 번역 · 원본 출처 언어
요약
The Department of Commerce (the Department) is extending the time limit of the preliminary and final results of this administrative review of the countervailing duty order on certain welded carbon steel pipe and tube products from Turkey. The review covers the period January 1, 1995 through December 31, 1995.
원본 출처 언어: Federal Register — All Documents원문 발표 열기 →