この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。
規制と法律 · 1996/11/61 分で読めます
Certain Welded Carbon Steel Pipe and Tube Products from Turkey; Extension of Time Limit for Countervailing Duty Administrative Review
ローカル自動翻訳 · 情報源の原言語
概要
The Department of Commerce (the Department) is extending the time limit of the preliminary and final results of this administrative review of the countervailing duty order on certain welded carbon steel pipe and tube products from Turkey. The review covers the period January 1, 1995 through December 31, 1995.
情報源の原言語: Federal Register — All Documents原文の発表を開く →