BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 1996/11/61 分钟阅读

Certain Welded Carbon Steel Pipe and Tube Products from Turkey; Extension of Time Limit for Countervailing Duty Administrative Review

本地自动翻译 · 来源原始语言

摘要

The Department of Commerce (the Department) is extending the time limit of the preliminary and final results of this administrative review of the countervailing duty order on certain welded carbon steel pipe and tube products from Turkey. The review covers the period January 1, 1995 through December 31, 1995.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →