BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2026/3/111 分钟阅读

Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Exemption

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption from the regulation that would have required the application for renewal of Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Nuclear Power Plant, Units 1 and 2, respectively, to be referred to the Advisory Committee on Reactor Safeguards for a review and report, with any report being made part of the record of the application and made available to the public, except to the extent that security classification prevents disclosure. Due to this exemption, such referral, review, and report are no longer required.

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →