BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Energía y medio ambiente · 11/3/20261 min de lectura

Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Exemption

Traducción automática local · Idioma original de la fuente

Resumen

The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption from the regulation that would have required the application for renewal of Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Nuclear Power Plant, Units 1 and 2, respectively, to be referred to the Advisory Committee on Reactor Safeguards for a review and report, with any report being made part of the record of the application and made available to the public, except to the extent that security classification prevents disclosure. Due to this exemption, such referral, review, and report are no longer required.

Idioma original de la fuente: Federal Register — Nuclear Regulatory CommissionAbrir el comunicado original →