BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Énergie et environnement · 11/03/20261 min de lecture

Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Exemption

Traduction automatique locale · Langue originale de la source

Résumé

The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption from the regulation that would have required the application for renewal of Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Nuclear Power Plant, Units 1 and 2, respectively, to be referred to the Advisory Committee on Reactor Safeguards for a review and report, with any report being made part of the record of the application and made available to the public, except to the extent that security classification prevents disclosure. Due to this exemption, such referral, review, and report are no longer required.

Langue originale de la source: Federal Register — Nuclear Regulatory CommissionOuvrir le communiqué original →

Explorer les analyses

Analyses business →