BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2021/8/311 分钟阅读

Loveland Area Projects and Western Area Colorado Missouri Balancing Authority-Rate Order No. WAPA-197

本地自动翻译 · 来源原始语言

摘要

The formula rates for the Rocky Mountain Region (RMR) of the Western Area Power Administration (WAPA) to use under the WEIS Market (Provisional Formula Rates) have been confirmed, approved, and placed into effect on an interim basis. RMR has converted the existing rates for short-term sales for RMR to use under the WEIS Market to long-term formula rates. The existing formula rates (approved under the WAPA Administrator's short-term rate authority) expire on September 30, 2021. No changes were made to the existing formula rates under the rates for short-term sales under Rate Schedules L-NFJDT (joint dispatch transmission), L-AS4 (energy imbalance), L-AS7 (balancing authority real power losses), and L-AS9 (generator imbalance).

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →