BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Regulação e direito · 31/08/20211 min de leitura

Loveland Area Projects and Western Area Colorado Missouri Balancing Authority-Rate Order No. WAPA-197

Tradução automática local · Idioma original da fonte

Resumo

The formula rates for the Rocky Mountain Region (RMR) of the Western Area Power Administration (WAPA) to use under the WEIS Market (Provisional Formula Rates) have been confirmed, approved, and placed into effect on an interim basis. RMR has converted the existing rates for short-term sales for RMR to use under the WEIS Market to long-term formula rates. The existing formula rates (approved under the WAPA Administrator's short-term rate authority) expire on September 30, 2021. No changes were made to the existing formula rates under the rates for short-term sales under Rate Schedules L-NFJDT (joint dispatch transmission), L-AS4 (energy imbalance), L-AS7 (balancing authority real power losses), and L-AS9 (generator imbalance).

Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →

Explorar análises

Análises empresariais →