BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 31‏/8‏/20211 دقائق للقراءة

Loveland Area Projects and Western Area Colorado Missouri Balancing Authority-Rate Order No. WAPA-197

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

The formula rates for the Rocky Mountain Region (RMR) of the Western Area Power Administration (WAPA) to use under the WEIS Market (Provisional Formula Rates) have been confirmed, approved, and placed into effect on an interim basis. RMR has converted the existing rates for short-term sales for RMR to use under the WEIS Market to long-term formula rates. The existing formula rates (approved under the WAPA Administrator's short-term rate authority) expire on September 30, 2021. No changes were made to the existing formula rates under the rates for short-term sales under Rate Schedules L-NFJDT (joint dispatch transmission), L-AS4 (energy imbalance), L-AS7 (balancing authority real power losses), and L-AS9 (generator imbalance).

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →