本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2018/12/211 分钟阅读
Notice of Availability of The Great Lakes and Mississippi River Interbasin Study-Brandon Road Integrated Feasibility Study and Environmental Impact Statement-Will County, Illinois
本地自动翻译 · 来源原始语言
摘要
The U.S. Army Corps of Engineers (USACE), Rock Island and Chicago Districts, are extending the comment period for the report "The Great Lakes and Mississippi River Interbasin Study (GLMRIS)-- Brandon Road Integrated Feasibility Study and Environmental Impact Statement (EIS)--Will County, Illinois," (Final GLMRIS-Brandon Road Report & EIS) for 14 days in response to stakeholder requests for an extension, from December 24, 2018 to January 7, 2019.
来源原始语言: Federal Register — All Documents打开原始公告 →