Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.
Düzenleme ve hukuk · 21.12.20181 dk okuma
Notice of Availability of The Great Lakes and Mississippi River Interbasin Study-Brandon Road Integrated Feasibility Study and Environmental Impact Statement-Will County, Illinois
Yerel otomatik çeviri · Kaynağın orijinal dili
Özet
The U.S. Army Corps of Engineers (USACE), Rock Island and Chicago Districts, are extending the comment period for the report "The Great Lakes and Mississippi River Interbasin Study (GLMRIS)-- Brandon Road Integrated Feasibility Study and Environmental Impact Statement (EIS)--Will County, Illinois," (Final GLMRIS-Brandon Road Report & EIS) for 14 days in response to stakeholder requests for an extension, from December 24, 2018 to January 7, 2019.
Kaynağın orijinal dili: Federal Register — All DocumentsOrijinal duyuruyu açın →