Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 21/12/20181 min de lecture
Notice of Availability of The Great Lakes and Mississippi River Interbasin Study-Brandon Road Integrated Feasibility Study and Environmental Impact Statement-Will County, Illinois
Traduction automatique locale · Langue originale de la source
Résumé
The U.S. Army Corps of Engineers (USACE), Rock Island and Chicago Districts, are extending the comment period for the report "The Great Lakes and Mississippi River Interbasin Study (GLMRIS)-- Brandon Road Integrated Feasibility Study and Environmental Impact Statement (EIS)--Will County, Illinois," (Final GLMRIS-Brandon Road Report & EIS) for 14 days in response to stakeholder requests for an extension, from December 24, 2018 to January 7, 2019.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →