BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2019/1/311 分钟阅读

Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by Entergy Nuclear Operations, Inc. (ENOI) on November 16, 2018. The application seeks NRC approval of the direct and indirect transfers of Renewed Facility Operating License No. DPR-35 for Pilgrim Nuclear Power Station (Pilgrim) as well as the general license for Pilgrim Independent Spent Fuel Storage Installation (ISFSI), collectively the Licenses. ENOI on behalf of itself and Entergy Nuclear Generation Company (ENGC), Holtec International (Holtec), and Holtec Decommissioning International, LLC (HDI) requests that the NRC consent to (1) the indirect transfer of control of the Licenses to Holtec; and (2) the direct transfer of ENOI's operating authority to HDI. The NRC is also considering amending the renewed facility operating license for administrative purposes to reflect the proposed transfer. The application contains sensitive unclassified non-safeguards information (SUNSI).

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →