BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Énergie et environnement · 31/01/20191 min de lecture

Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment

Traduction automatique locale · Langue originale de la source

Résumé

The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by Entergy Nuclear Operations, Inc. (ENOI) on November 16, 2018. The application seeks NRC approval of the direct and indirect transfers of Renewed Facility Operating License No. DPR-35 for Pilgrim Nuclear Power Station (Pilgrim) as well as the general license for Pilgrim Independent Spent Fuel Storage Installation (ISFSI), collectively the Licenses. ENOI on behalf of itself and Entergy Nuclear Generation Company (ENGC), Holtec International (Holtec), and Holtec Decommissioning International, LLC (HDI) requests that the NRC consent to (1) the indirect transfer of control of the Licenses to Holtec; and (2) the direct transfer of ENOI's operating authority to HDI. The NRC is also considering amending the renewed facility operating license for administrative purposes to reflect the proposed transfer. The application contains sensitive unclassified non-safeguards information (SUNSI).

Langue originale de la source: Federal Register — Nuclear Regulatory CommissionOuvrir le communiqué original →

Explorer les analyses

Analyses business →