BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Energia e ambiente · 31/01/20191 min di lettura

Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by Entergy Nuclear Operations, Inc. (ENOI) on November 16, 2018. The application seeks NRC approval of the direct and indirect transfers of Renewed Facility Operating License No. DPR-35 for Pilgrim Nuclear Power Station (Pilgrim) as well as the general license for Pilgrim Independent Spent Fuel Storage Installation (ISFSI), collectively the Licenses. ENOI on behalf of itself and Entergy Nuclear Generation Company (ENGC), Holtec International (Holtec), and Holtec Decommissioning International, LLC (HDI) requests that the NRC consent to (1) the indirect transfer of control of the Licenses to Holtec; and (2) the direct transfer of ENOI's operating authority to HDI. The NRC is also considering amending the renewed facility operating license for administrative purposes to reflect the proposed transfer. The application contains sensitive unclassified non-safeguards information (SUNSI).

Lingua originale della fonte: Federal Register — Nuclear Regulatory CommissionApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →