BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2017/9/271 分钟阅读

Notice of Availability of The Great Lakes and Mississippi River Interbasin Study-Brandon Road Draft Integrated Feasibility Study and Environmental Impact Statement-Will County, Illinois

本地自动翻译 · 来源原始语言

摘要

The U.S. Army Corps of Engineers (USACE) is extending the comment period for the report "The Great Lakes and Mississippi River Interbasin Study--Brandon Road Draft Integrated Feasibility Study and Environmental Impact Statement--Will County, Illinois" (GLMRIS-Brandon Road) for 45 days in response to stakeholder requests for an extension, from October 2, 2017 to November 16, 2017.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →