本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2017/9/271 分钟阅读
Notice of Availability of The Great Lakes and Mississippi River Interbasin Study-Brandon Road Draft Integrated Feasibility Study and Environmental Impact Statement-Will County, Illinois
本地自动翻译 · 来源原始语言
摘要
The U.S. Army Corps of Engineers (USACE) is extending the comment period for the report "The Great Lakes and Mississippi River Interbasin Study--Brandon Road Draft Integrated Feasibility Study and Environmental Impact Statement--Will County, Illinois" (GLMRIS-Brandon Road) for 45 days in response to stakeholder requests for an extension, from October 2, 2017 to November 16, 2017.
来源原始语言: Federal Register — All Documents打开原始公告 →