BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 27/9/20171 min de lectura

Notice of Availability of The Great Lakes and Mississippi River Interbasin Study-Brandon Road Draft Integrated Feasibility Study and Environmental Impact Statement-Will County, Illinois

Traducción automática local · Idioma original de la fuente

Resumen

The U.S. Army Corps of Engineers (USACE) is extending the comment period for the report "The Great Lakes and Mississippi River Interbasin Study--Brandon Road Draft Integrated Feasibility Study and Environmental Impact Statement--Will County, Illinois" (GLMRIS-Brandon Road) for 45 days in response to stakeholder requests for an extension, from October 2, 2017 to November 16, 2017.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →