Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 27/09/20171 min de lecture
Notice of Availability of The Great Lakes and Mississippi River Interbasin Study-Brandon Road Draft Integrated Feasibility Study and Environmental Impact Statement-Will County, Illinois
Traduction automatique locale · Langue originale de la source
Résumé
The U.S. Army Corps of Engineers (USACE) is extending the comment period for the report "The Great Lakes and Mississippi River Interbasin Study--Brandon Road Draft Integrated Feasibility Study and Environmental Impact Statement--Will County, Illinois" (GLMRIS-Brandon Road) for 45 days in response to stakeholder requests for an extension, from October 2, 2017 to November 16, 2017.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →