BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2017/5/11 分钟阅读

Pacific Gas and Electric Company; Diablo Canyon Power Plant, Units 1 and 2

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Pacific Gas and Electric Company (PG&E) to withdraw its application dated May 12, 2016, for the proposed amendments to Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Power Plant (DCPP), Units 1 and 2. The proposed amendments would have modified the DCPP Technical Specifications (TSs) to adopt Nuclear Energy Institute (NEI) 94-01, Revision 2A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR part 50, Appendix J."

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →