BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Energía y medio ambiente · 1/5/20171 min de lectura

Pacific Gas and Electric Company; Diablo Canyon Power Plant, Units 1 and 2

Traducción automática local · Idioma original de la fuente

Resumen

The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Pacific Gas and Electric Company (PG&E) to withdraw its application dated May 12, 2016, for the proposed amendments to Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Power Plant (DCPP), Units 1 and 2. The proposed amendments would have modified the DCPP Technical Specifications (TSs) to adopt Nuclear Energy Institute (NEI) 94-01, Revision 2A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR part 50, Appendix J."

Idioma original de la fuente: Federal Register — Nuclear Regulatory CommissionAbrir el comunicado original →