The U.S. Nuclear Regulatory Commission (NRC) has granted the request of Pacific Gas and Electric Company (PG&E) to withdraw its application dated May 12, 2016, for the proposed amendments to Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Power Plant (DCPP), Units 1 and 2. The proposed amendments would have modified the DCPP Technical Specifications (TSs) to adopt Nuclear Energy Institute (NEI) 94-01, Revision 2A, "Industry Guideline for Implementing Performance-Based Option of 10 CFR part 50, Appendix J."