BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

能源与环境 · 2012/4/101 分钟阅读

Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

本地自动翻译 · 来源原始语言

摘要

The U.S. Nuclear Regulatory Commission (NRC or the Commission) is requesting public comment on Chapters 7-18 of Draft Interim Staff Guidance (ISG) NPR-ISG-2011-002, augmenting NUREG-1537, Part 1, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content," for the production of radioisotopes and NUREG-1537, Part 2, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review Plan and Acceptance Criteria," for the production of radioisotopes. The ISG augmenting NUREG-1537, Parts 1 & 2, Chapters 1-6 were published in the Federal Register for comment on October 13, 2011 (76 FR 63668). This draft ISG provides guidance for preparing and reviewing applications to obtain a construction permit and operating license for a radioisotope production facility.

来源原始语言: Federal Register — Nuclear Regulatory Commission打开原始公告 →

探索专题

商业洞察 →