BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Energia e ambiente · 10/04/20121 min de leitura

Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

Tradução automática local · Idioma original da fonte

Resumo

The U.S. Nuclear Regulatory Commission (NRC or the Commission) is requesting public comment on Chapters 7-18 of Draft Interim Staff Guidance (ISG) NPR-ISG-2011-002, augmenting NUREG-1537, Part 1, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Format and Content," for the production of radioisotopes and NUREG-1537, Part 2, "Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors: Standard Review Plan and Acceptance Criteria," for the production of radioisotopes. The ISG augmenting NUREG-1537, Parts 1 & 2, Chapters 1-6 were published in the Federal Register for comment on October 13, 2011 (76 FR 63668). This draft ISG provides guidance for preparing and reviewing applications to obtain a construction permit and operating license for a radioisotope production facility.

Idioma original da fonte: Federal Register — Nuclear Regulatory CommissionAbrir o comunicado original →

Explorar análises

Análises empresariais →