本文翻译正在准备中。在此之前,我们暂时显示英文原文。
国际贸易 · 2004/10/251 分钟阅读
Hot-rolled Flat-Rolled Carbon-Quality Steel Products from Brazil; Extension of Time Limit for the Final Results of Sunset Review of Countervailing Duty Order
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce ("the Department") is extending the time limit for its final results in the sunset review of the countervailing duty order on hot-rolled flat-rolled carbon-quality steel products ("hot-rolled steel") from Brazil. The Department intends to issue the final results of this sunset reviews on or about November 22, 2004.
来源原始语言: Federal Register — Department of Commerce打开原始公告 →