Comercio internacional · 25/10/20041 min de lectura
Hot-rolled Flat-Rolled Carbon-Quality Steel Products from Brazil; Extension of Time Limit for the Final Results of Sunset Review of Countervailing Duty Order
Traducción automática local · Idioma original de la fuente
Resumen
The Department of Commerce ("the Department") is extending the time limit for its final results in the sunset review of the countervailing duty order on hot-rolled flat-rolled carbon-quality steel products ("hot-rolled steel") from Brazil. The Department intends to issue the final results of this sunset reviews on or about November 22, 2004.