Uluslararası ticaret · 25.10.20041 dk okuma
Hot-rolled Flat-Rolled Carbon-Quality Steel Products from Brazil; Extension of Time Limit for the Final Results of Sunset Review of Countervailing Duty Order
Yerel otomatik çeviri · Kaynağın orijinal dili
Özet
The Department of Commerce ("the Department") is extending the time limit for its final results in the sunset review of the countervailing duty order on hot-rolled flat-rolled carbon-quality steel products ("hot-rolled steel") from Brazil. The Department intends to issue the final results of this sunset reviews on or about November 22, 2004.