BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2000/10/41 分钟阅读

Grain-Oriented Electrical Steel From Italy: Notice of Extension of Time Limit for Final Results of Antidumping Administrative Review

本地自动翻译 · 来源原始语言

摘要

The Department of Commerce (the Department) is extending the time limit for the final results of the antidumping duty administrative review of grain-oriented electrical steel (GOES) from Italy. The period of review is August 1, 1998 through July 31, 1999.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →