Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.
Regulação e direito · 04/10/20001 min de leitura
Grain-Oriented Electrical Steel From Italy: Notice of Extension of Time Limit for Final Results of Antidumping Administrative Review
Tradução automática local · Idioma original da fonte
Resumo
The Department of Commerce (the Department) is extending the time limit for the final results of the antidumping duty administrative review of grain-oriented electrical steel (GOES) from Italy. The period of review is August 1, 1998 through July 31, 1999.
Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →